The Need
Boehmers Concrete in Ontario, part of the Holcim group, wanted
a low profile plant, 160 yd³ per hour capacity, which had to be enclosed for protection
from cold temperatures.
BMH Solution
In a turnkey project, including the charging conveyor and
dust control system, BMH Systems freed the client from all construction and start-up concerns.
Environmental concerns helped us to develop and incorporate a dust collection system capable of
recycling the dust from the loading area onto the belt conveyor.